<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0"
    xmlns:dc="http://purl.org/dc/elements/1.1/"
    xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
    xmlns:admin="http://webns.net/mvcb/"
    xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#"
    xmlns:content="http://purl.org/rss/1.0/modules/content/">

    <channel>
    
    <title>Corderoy &#45; Projects</title>
    <link>http://www.corderoy.com/index.php</link>
    <description></description>
    <dc:language>en</dc:language>
    <dc:creator>kirsten.robertson@corderoy.com</dc:creator>
    <dc:rights>Copyright 2007</dc:rights>
    <dc:date>2007-07-30T16:34:00+00:00</dc:date>
    <admin:generatorAgent rdf:resource="http://www.pmachine.com/" />
    

    <item>
      <title>Trent Valley Four Tracking Project TV4</title>
      <link>http://www.corderoy.com/projects/detail/trent_valley_four_tracking_project_tv4/</link>
      <guid>http://www.corderoy.com/site/trent_valley_four_tracking_project_tv4/#When:16:34:00Z</guid>
      <description>Increase permanent way capacity on this part of the West Coast Main Line to four tracks from two, including associated signalling, telecommunications and OLE / electrification and plant</description>
      <dc:subject>Historical</dc:subject>
<content:encoded><![CDATA[]]><![CDATA[<p>Increase permanent way capacity on this part of the West Coast Main Line to four tracks from two, including associated signalling, telecommunications and OLE / electrification and plant
</p>]]></content:encoded>
      <dc:date>2007-07-30T16:34:00+00:00</dc:date>
    </item>

    <item>
      <title>Tube Lines SMEP (Station Modernisation &amp;amp; Enhancement Project) Piccadilly Line</title>
      <link>http://www.corderoy.com/projects/detail/tube_lines_smep_station_modernisation_enhancement_project_piccadilly_line/</link>
      <guid>http://www.corderoy.com/site/tube_lines_smep_station_modernisation_enhancement_project_piccadilly_line/#When:16:29:01Z</guid>
      <description>Modernisation and Refurbishment of stations on the Piccadilly Line under a Partnering Agreement between Tube Lines, Contractor and Designer. Packages comprised the following Underground Stations &#45; Arnos Grove, Manor House, Caledonian Road, Turnpike Lane, Northfields and Sudbury Town</description>
      <dc:subject>Historical</dc:subject>
<content:encoded><![CDATA[]]><![CDATA[<p>Modernisation and Refurbishment of stations on the Piccadilly Line under a Partnering Agreement between Tube Lines, Contractor and Designer. Packages comprised the following Underground Stations - Arnos Grove, Manor House, Caledonian Road, Turnpike Lane, Northfields and Sudbury Town
</p>]]></content:encoded>
      <dc:date>2007-07-30T16:29:01+00:00</dc:date>
    </item>

    <item>
      <title>Kings Cross</title>
      <link>http://www.corderoy.com/projects/detail/kings_cross/</link>
      <guid>http://www.corderoy.com/site/kings_cross/#When:16:22:01Z</guid>
      <description>The Redevelopment of Kings Cross Station to accommodate the CTRL</description>
      <dc:subject>Current</dc:subject>
<content:encoded><![CDATA[]]><![CDATA[<p>The Redevelopment of Kings Cross Station to accommodate the CTRL
</p>]]></content:encoded>
      <dc:date>2007-07-30T16:22:01+00:00</dc:date>
    </item>

    <item>
      <title>Wembley Park Station</title>
      <link>http://www.corderoy.com/projects/detail/wembley_park_station/</link>
      <guid>http://www.corderoy.com/site/wembley_park_station/#When:16:19:00Z</guid>
      <description>Capacity enhancement and station modernisation</description>
      <dc:subject>Historical</dc:subject>
<content:encoded><![CDATA[]]><![CDATA[<p>Capacity enhancement and station modernisation
</p>]]></content:encoded>
      <dc:date>2007-07-30T16:19:00+00:00</dc:date>
    </item>

    <item>
      <title>N9/N10 Kilcullen to Waterford Road Scheme (Phase 3)</title>
      <link>http://www.corderoy.com/projects/detail/n9_n10_kilcullen_to_waterford_road_scheme_phase_3/</link>
      <guid>http://www.corderoy.com/site/n9_n10_kilcullen_to_waterford_road_scheme_phase_3/#When:10:31:01Z</guid>
      <description>Phase 3 is the construction of 27km of high quality dual carriageway between Kilcullen and Carlow together with the construction of Athy Link Road 12km and associated structures.</description>
      <dc:subject>Current</dc:subject>
<content:encoded><![CDATA[]]><![CDATA[<p>Phase 3 is the construction of 27km of high quality dual carriageway between Kilcullen and Carlow together with the construction of Athy Link Road 12km and associated structures.
</p>]]></content:encoded>
      <dc:date>2007-06-26T10:31:01+00:00</dc:date>
    </item>

    <item>
      <title>Ryder Cup Infrastructure</title>
      <link>http://www.corderoy.com/projects/detail/ryder_cup_infrastructure/</link>
      <guid>http://www.corderoy.com/site/ryder_cup_infrastructure/#When:09:58:00Z</guid>
      <description>The main element of the work is localised widening and pavement resurfacing/reconstruction of approximately 9km of carriageway and improvement of the drainage network. Four new slip roads are to be constructed as part of a grade&#45;separated interchange off the A449 along with the provision of associated earthworks and a retaining wall structure.</description>
      <dc:subject>Current</dc:subject>
<content:encoded><![CDATA[]]><![CDATA[<p>The main element of the work is localised widening and pavement resurfacing/reconstruction of approximately 9km of carriageway and improvement of the drainage network. Four new slip roads are to be constructed as part of a grade-separated interchange off the A449 along with the provision of associated earthworks and a retaining wall structure.
</p>]]></content:encoded>
      <dc:date>2007-06-26T09:58:00+00:00</dc:date>
    </item>

    <item>
      <title>Project Evergreen Phase 1A  Chiltern Line Enhancements</title>
      <link>http://www.corderoy.com/projects/detail/project_evergreen_phase_1a_chiltern_line_enhancements/</link>
      <guid>http://www.corderoy.com/site/project_evergreen_phase_1a_chiltern_line_enhancements/#When:12:02:00Z</guid>
      <description>Dual tracking of the Ayhno to Bicester line. This line had been reduced to single track in the 60s and was restored to 2 track to improve capacity</description>
      <dc:subject>Historical</dc:subject>
<content:encoded><![CDATA[]]><![CDATA[<p>Dual tracking of the Ayhno to Bicester line. This line had been reduced to single track in the 60s and was restored to 2 track to improve capacity
</p>]]></content:encoded>
      <dc:date>2007-06-19T12:02:00+00:00</dc:date>
    </item>

    <item>
      <title>Bedford to Bletchley Resignalling</title>
      <link>http://www.corderoy.com/projects/detail/bedford_to_bletchley_resignalling/</link>
      <guid>http://www.corderoy.com/site/bedford_to_bletchley_resignalling/#When:12:01:00Z</guid>
      <description>Replacement of first generation Victorian mechanical signalling from the 1870s in the Marston Vale between Bedford and Bletchley with modern computer controlled &#1171;colour aspect signalling</description>
      <dc:subject>Historical</dc:subject>
<content:encoded><![CDATA[]]><![CDATA[<p>Replacement of first generation Victorian mechanical signalling from the 1870s in the Marston Vale between Bedford and Bletchley with modern computer controlled &#1171;colour aspect signalling
</p>]]></content:encoded>
      <dc:date>2007-06-19T12:01:00+00:00</dc:date>
    </item>

    <item>
      <title>Relocation of Eurostar North Pole&#1236; Train Servicing Depot</title>
      <link>http://www.corderoy.com/projects/detail/relocation_of_eurostar_north_pole_train_servicing_depot/</link>
      <guid>http://www.corderoy.com/site/relocation_of_eurostar_north_pole_train_servicing_depot/#When:11:52:02Z</guid>
      <description>Relocation of Eurostar North Pole Train Servicing Depot from west London &#45; alternative locations in east London and home counties areas were considered, including all track, signalling, overhead line and civil engineering works plus new buildings and train maintenance heavy equipment.</description>
      <dc:subject>Historical</dc:subject>
<content:encoded><![CDATA[]]><![CDATA[<p>Relocation of Eurostar North Pole Train Servicing Depot from west London - alternative locations in east London and home counties areas were considered, including all track, signalling, overhead line and civil engineering works plus new buildings and train maintenance heavy equipment.
</p>]]></content:encoded>
      <dc:date>2007-06-19T11:52:02+00:00</dc:date>
    </item>

    <item>
      <title>Daventry International Rail Freight Terminal</title>
      <link>http://www.corderoy.com/projects/detail/daventry_international_rail_freight_terminal/</link>
      <guid>http://www.corderoy.com/site/daventry_international_rail_freight_terminal/#When:11:45:00Z</guid>
      <description>Rail connected Logistics Park &#45; major infrastructure development including railport with 9km of private sidings and associated signalling and overhead line equipment.</description>
      <dc:subject>Historical</dc:subject>
<content:encoded><![CDATA[]]><![CDATA[<p>Rail connected Logistics Park - major infrastructure development including railport with 9km of private sidings and associated signalling and overhead line equipment.
</p>]]></content:encoded>
      <dc:date>2007-06-19T11:45:00+00:00</dc:date>
    </item>

    
    </channel>
</rss>